Cement Urethane Slurry System

Project Overview: Cement Urethane Slurry System 1,176 Sqft                                                                                                                                                                                                      Urethane cement slurries are created by mixing a polymer base with sands, cements or crushed stone to create a thicker liquid base that will set with greater thickness and more durability. We often refer to the viscosity achieved as a “pancake batter”-like consistency. These slurry systems provide a thickness from 1/16″ to 1/8″ and … [Read more...]

Warehouse Epoxy Floor Coating

Project Overview: Warehouse Epoxy Coating System 1120 Sq.ftOur client came to us in a very difficult situation. One of their pieces of machinery had a very sizable ink spill and the issue needed to be taken care of immediately to prevent work place injury and to stay within the companies safety regulations. Luckily due to the close proximity of our client and our dedication to customer service we were able to come in and fix their floors only a few days after the "inkcident". To start this project we prepped the entire area using diamond grinders which were able to cut through the ink. … [Read more...]

Laundromat Flooring System

Project Overview: Warehouse Laundromat Flooring System 16,000 Sq.ftLaundromat floors are exposed to a great deal of foot and cart traffic, spilled laundry chemicals that may not be immediately cleaned up, water and steam, not to mention the constant vibration and weight of heavy machinery. When installing a laundromat floor there are many things to take into consideration, such as s kid and slip resistance to help ensure safety ,water proofing underlayments, chemical resistance to help prevent damage from detergents, bleach and cleaning solvents, abrasion and wear resistance to withstand … [Read more...]

Battery Charging Station Flooring

Project Overview:  3,000 sq ft battery charging area floor coatingThe floor for a battery charging  station  requires extra attention to detail because it must meet building codes and regulations issued by the Environmental Protection Agency (EPA), the Occupational Safety and Health Administration (OSHA), the National Fire Protection Association (NFPA), and others. Due to the corrosive nature of battery acid, the flooring of a charging room must be resistant to acid, which will  lead to an easier clean-up in the event of a spill to help keep all equipment and employees safe! Without an … [Read more...]

Warehouse Floor Coating – Grind and Seal

Project Overview: 5000 sqft Warehouse Floor CoatingOften referred to as a grind and seal we applied a two coat epoxy system in this warehouse. This process typically will mill or remove the top layer of an existing slab to expose virgin or white concrete and create an aesthetic similar to polish. Our system varies from a polish in multiple beneficial ways its is scratch, chemical and stain resistant.  It is a very budget friendly system and allows for return to service in as little as 8 hours!Applying a two component resin based coating penetrates and establishes a wear surface to add … [Read more...]

Warehouse Floor Coating

Project Overview: Warehouse Floor Coating 5,000 sqftAs a family owned and operated business we take special pride in what we do, and it’s always great when we can team up with another business within the community. That’s why when our friends over at Soma labs contacted us with their flooring issues we need we had to help them out. The existing urethane cement flooring system had the typical ware and tear you’d expect but the main issue was the dust. Luckily we had the perfect solution for them.  We prepped the concrete with diamond grinders to remove any laitance and contamination and get … [Read more...]

Warehouse Epoxy Flooring System

Project Overview: Warehouse Epoxy Flooring System  8800 sq. ftAs far as warehouse epoxy flooring systems go, this was a very routine procedure. We prepped the concrete with diamond grinders to remove any laitance and contamination and get down to white concrete so that the epoxy would have a solid bond. After the floor was prepped we swept and vacuumed up all of the dust to ensure a direct bond. Dust is one of the leading causes of epoxy floor failures. Before the first coat was applied we also edged all floor to wall joints and taped all terminations and drains to ensure a clean floor … [Read more...]

Warehouse Epoxy Coating

Project Overview: 170,000 square feet of warehouse epoxy coating As a protective coatings professional our job is to not only perform installations but evaluate and design specifications to meet our clients' purpose and long-term budget. The area below will ultimately be used as a staging and distribution center for a large bottling company. Our client expressed concern about the typical specification of an acrylic sealer or dust proofing system and its lack of protection. More specifically it's ability to resist staining and the life expectancy of the product itself. High Performance … [Read more...]

Concrete Coating Contractor

Project Overview: 5000 square feet of Warehouse Flooring.  As a concrete coating contractor High Performance Systems offers many options to fit the need of the spaces use and the customer's timeline and budget. We pride ourselves on offering the protective and resinous flooring industries best option for the facilities long-term needs. This client asked for our team to provide them with a concrete coating system that was scratch resistant, resistant to staining due to industrial inks and dyes, and to repair existing spalls and cracks near joints within their warehouse space. Our … [Read more...]

Warehouse Flooring | Sayreville, NJ

Project Area: Industrial Warehouse Project Size: 5400 Sq. Ft. Products Used: 100% Solids Epoxy, Aliphatic Urethane          This warehouse flooring was installed for a sausage manufacturer located in Sayreville, NJ. Our client was looking to reduce dust, reduce maintenance time, and improve the overall aesthetics of the warehouse to help impress any potential clients or visitors to their facility. We began the installation by diamond grinding the concrete substrate to remove any residual contaminants and to create a mechanical profile for our resinous flooring to bite in to and have … [Read more...]